天美影院

Skip to Content

Sites

Free Digital Bid Board

Free Digital Bid Board

Get promoted to GCs and organize all your project leads and bid invites in one place

Economic

Top 10 largest construction project starts in Canada and Trend Graph - January 2021

Top 10 largest construction project starts in Canada and Trend Graph - January 2021

The accompanying table records the 10 largest construction project starts in Canada in January 2021. Also included is the latest trend graph on starts. This looks at 12-month moving totals of the civil and non-residential building categories in Canada.

Top 10 largest construction project starts in Canada and Trend Graph - January 2021

There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.

Also, total construction activity is comprised of many small and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar and square footage volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.

Top 10 construction projects of the month – January 2021
REGION
(East to
West)
TYPE OF
CONSTRUCTION
DESCRIPTION
Sq. Ft.
000s
Dollars
000,000s
Quebec        
Micoua Engineering/Civil Saguenay-Lac-Saint-Jean / Micoua-Saguenay Section E (9 and 10) – Construction of a New 735 KV Line * $37
    Multiple Locations    
    贬测诲谤辞-蚕耻茅产别肠    
         
厂补颈苍迟-闯茅谤么尘别 Commercial Construction of a New Multifunctional Sports Complex 100 $27
    (2 structures; 3 storeys) 725, rue Ouimet    
    Ville de 厂补颈苍迟-闯茅谤么尘别    
         
Ontario        
Binbrook Engineering/Civil Waterdown to Finch Pipeline Project – First Section (Hamilton and Burlington) * $67
    Multiple Locations    
    Imperial Oil Ltd    
         
Barrie Residential L膩khouse Condos 275 $50
    (3 structures; 10 storeys; 178 units) 205 Dunlop St E    
    AALTO Development Inc    
         
Toronto Institutional Construction Manager – Runnymede Long Term Care 219 $49
    (1 structure; 5 storeys; 200 units) 625 Runnymede Rd    
    Runnymede Healthcare Centre    
         
Windsor Institutional Transforming Windsor Law (TWL) Building – University of Windsor – Ron W Ianni Faculty of Law Building Renovation 84 $29
    (1 structure) 401 Sunset Ave    
    University of Windsor    
         
Alberta        
Brooks Engineering/Civil Brooks Solar II Project * $50
    Trans-Canada Hwy    
    Elemental Energy    
         
Strathmore Engineering/Civil East Strathmore Solar Project * $30
    Sect 9, Township 24, Range 23    
    Elemental Energy    
         
British Columbia        
New Westminster Institutional Royal Columbian Hospital Redevelopment – Phase 2 334 $700
    (3 structures; 11 storeys; 229 units) 330 E Columbia St    
    Fraser Health/BC Ministry of Health    
         
Nanaimo Residential Ledgerwood Road Apartments 170 $31
    (1 structure; 5 storeys; 120 units) 4745 Ledgerwood Rd    
    WestUrban Developments Ltd (Owner’s Rep)    
         
TOTALS:     1,182 $1,070
 
*A square footage measure does not apply for alteration and engineering work.
Data source and table: 天美影院 鈥 CanaData.
Trend lines of construction starts in Canada 鈥 January 2021
Moving totals of the latest 12 months*
(天美影院 Insight Forecast Figures)
Trend lines of construction starts in Canada 鈥 January 2021 Graph
*For example, the January 2021 figure is the sum of the monthly numbers for February 2020 through January 2021.
Data source and chart: 天美影院 Insight 鈥 CanaData.

Interactive Visual


View this video to see how to use the filters in the Interactive Visual.

Print

Recent Comments (1 comments)

comments for this post are closed

Thomas R Jakobek Image Thomas R Jakobek

These projects and the ones that fall just below are the economic milestones for our recovery from Covid-19 shut downs.
Governments at all three levels need to re-think how they treat developers. Never forget the story about the Goose and the golden egg!

More

You might also like