The accompanying tables show the top 10 major upcoming Water Treatment Plant and Manufacturing & Warehousing construction projects in the U.S. They are all in the planning stage and are mainly new projects, but may also involve additions and/or alterations.
Shopping centers, hotels, office buildings, medical buildings, educational buildings, libraries and museums, sports and entertainment complexes, industrial projects and government buildings will all be covered on a rotating basis.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Finally, total construction activity is comprised of many small- and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
Project Title and Owner/Developer |
Location | Current Stage |
Project Value U.S. $ millions |
---|---|---|---|
SEPTIC TANK PHASEOUT – JACKSONVILLE ELECTRIC AUTHORITY | |||
JEA (Jacksonville Electric Authority) – Procurement | 听Jacksonville FL听 | Pre-Design | $2,000 |
HUNTINGTON BEACH WATER DESALINATION FACILITY | |||
Poseidon Water – Carlsbad | 听Huntington Beach CA听 | Pre-Design | $1,400 |
RFP CONSTRUCTION MANAGER – BULL RUN FILTRATION FACILITY | |||
City of Portland – Procurement | 听Portland OR听 | Construction Documents | $650 |
SMS: RFQ – PUBLIC-PRIVATE PARTNERSHIP (P3) PURIFIED WATER PROJECT | |||
Santa Clara Valley Water District (SCVWD) | 听San Jose, CA听 | Pre-Design | $600 |
STRAITS OF MACKINAC TUNNEL CONSTRUCTION – GREAT LAKES 5 PIPELINE REPLACEMENT | |||
Enbridge Energy LP – Superior | 听Mackinaw City MI听 | Construction Documents | $500 |
RFQ CONTRACTOR – YAZOO BACKWATER PUMPING PLANT | |||
US Army Corps of Engineers – Vicksburg District | 听Vicksburg MS听 | Pre-Design | $500 |
MID-BRETON SEDIMENT DIVERSION – CITY OF PLAQUEMINE | |||
Coastal Protection and Restoration Authority (CPRA) | 听Plaquemine LA听 | Pre-Design | $488 |
WATER AND SEWER – US ARMY CORPS OF ENGINEERS | |||
US Army Corps of Engineers – Vicksburg District | 听Lexington MA听 | Pre-Design | $400 |
GARDEN HILLS DETENTION BASIN PHASES 2, 3, 4, 5 – CITY OF CHAMPAIGN | |||
City of Champaign | 听Champaign IL听 | Pre-Design | $400 |
2020 BOND PACKAGE 1 – CITY OF TEMPE | |||
City of Tempe | 听Tempe AZ听 | Pre-Design | $350 |
Project Title and Owner/Developer |
Location | Current Stage |
Project Value U.S. $ millions |
---|---|---|---|
SAMSUNG AUSTIN SEMICONDUCTOR LLC CHIPMAKING PLANT | |||
Samsung Austin Semiconductor | 听Austin TX听 | Construction Documents | $17,000 |
FORMOSA PLASTICS SUNSHINE PROJECT | |||
Formosa Plastics LA | 听Saint James LA听 | Construction Documents | $9,400 |
GRON FUELS RENEWABLE DIESEL PLANT | |||
Fidelis Infrastructure | 听Baton Rough LA听 | Pre-Design | $9,200 |
SEMPRA ENERGY – LIQUEFIED NATURAL GAS EXPORT TERMINAL – PHASE 1 TRAINS 1 & 2 / PORT ARTHUR | |||
Sempra Energy | 听Port Authur TX听 | Construction Documents | $9,000 |
PLAQUEMINES PROJECT | |||
Venture Global LNG Inc. | 听Belle Chasse LA听 | Pre-Design | $8,500 |
PTTGC AMERICA ETHANE CRACKER PLANT | |||
PTTGC America | 听Shadyside OH听 | Construction Documents | $7,500 |
NACERO GASOLINE MANUFACTURING DEVELOPMENT / ODESSA | |||
Nacero Inc | 听Penwell TX听 | Pre-Design | $7,000 |
BLUE OVAL CITY MANUFACTURING FACILITY – FORD MOTOR COMPANY | |||
Ford Motor Land Development Corporation | 听Stanton TN听 | Pre-Design | $5,700 |
BLUEOVALSK BATTERY PARK – FORD MOTOR COMPANY | |||
Ford Motor Land Development Corporation | 听Glendale KY听 | Pre-Design | $5,700 |
SAMSUNG SEMICONDUCTOR MANUFACTURING FACILITY | |||
Samsung Semiconductor, Inc. | 听Phoenix AZ听 | Pre-Design | $5,600 |
While every effort is made to ensure the correctness of 天美影院’s information, we have hundreds of thousands of projects in our database and some errors will occur. We greatly appreciate hearing from readers concerning updates and will make proper revisions promptly.
Q. If Enbridge is serious about building a tunnel through the鉂わ笍of the Great Lakes, why is there no plan or $ allocated for it in their 2020 SEC 10k filing? A. The real purpose of the tunnel is to keep old line 5 operating 20+yrs. beyond its 50-year lifetime to earn $1-2million/day despite its shutdown order.