ÌìÃÀÓ°Ôº

Skip to Content

Sites

Free Digital Bid Board

Free Digital Bid Board

Get promoted to GCs and organize all your project leads and bid invites in one place

Economic

Top 10 largest construction project starts in Canada and Trend Graph - July 2022

Top 10 largest construction project starts in Canada and Trend Graph - July 2022

The accompanying table records the 10 largest construction project starts in Canada in July 2022. Also included is the latest trend graph on starts. This looks at 12-month moving totals of the civil and non-residential building categories in Canada.

There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.

Also, total construction activity is comprised of many small and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar and square footage volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.

Top 10 construction projects of the month – July 2022
REGION
(East to
West)
TYPE OF
CONSTRUCTION
DESCRIPTION
Sq. Ft.
000s
Dollars
000,000s
Ontario Ìý Ìý    
London Civil/Engineering Highway 401 – Design-Build Major – Five Structure Replacements, Highbury Avenue Interchange Improvements, and Highway 401 Pavement Rehabilitation & Reconstruction * $133
Ìý Ìý (2 structures) Multiple Locations Ìý Ìý
Ìý Ìý Ministry of Transportation – Ontario Ìý Ìý
Ìý Ìý Ìý Ìý Ìý
Toronto Residential QA (Queen & Ashbridge) Condominium 642Ìý $122
Ìý Ìý (3 structures; 17 storeys; 363 units) 1555 Queen St E Ìý Ìý
Ìý Ìý RioCan Real Estate Investment Trust/Context Ìý Ìý
Ìý Ìý Ìý Ìý Ìý
Toronto Residential 400 King St West – Mixed Use Building 461Ìý $92
Ìý Ìý (3 structures; 48 storeys; 612 units) 400 King St W Ìý Ìý
Ìý Ìý Plazacorp Properties Ltd/Main and Main Developments Inc Ìý Ìý
Ìý Ìý Ìý Ìý Ìý
King City Institutional Township Wide Recreation Centre Project (TWRC) 120Ìý $86
Ìý Ìý (2 structures; 1 storey) 1600 15th Sideroad Ìý Ìý
Ìý Ìý Township of King Ìý Ìý
Ìý Ìý Ìý Ìý Ìý
Gloucester Residential Place LUX Multi-Residential & Hotel Development – Phase 1/Tower 3 392Ìý $75
Ìý Ìý (4 structures; 44 storeys; 426 units) 1178 Cummings Ave Ìý Ìý
Ìý Ìý PMA Architectes (Owner’s Rep) Ìý Ìý
Ìý Ìý Ìý Ìý Ìý
Ottawa Civil/Engineering Highway 417 – Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, and Structural * $55
Ìý Ìý (3 structures) Walkley Rd Ìý Ìý
Ìý Ìý Ministry of Transportation – Ontario Ìý Ìý
Ìý Ìý Ìý Ìý Ìý
Saskatchewan Ìý Ìý Ìý Ìý
Regina Industrial Cargill Canola Processing Facility at the Global Transportation Hub * $350
Ìý Ìý (2 structures) Dewdney Ave Ìý Ìý
Ìý Ìý Cargill Limited Canada Ìý Ìý
Ìý Ìý Ìý Ìý Ìý
Prince Albert Civil/Engineering Prince Albert Aquatic and Arena Recreation Centre (Phase One) 150 $150
Ìý Ìý (3 structures; 1 storey) 1405 Bishop Pascal Pl Ìý Ìý
Ìý Ìý City of Prince Albert Ìý Ìý
Ìý Ìý Ìý Ìý Ìý
British Columbia Ìý Ìý Ìý Ìý
Vancouver Commercial West Pender Street Office Tower 345Ìý $85
Ìý Ìý (3 structures; 32 storeys) 1166 W Pender St Ìý Ìý
Ìý Ìý Reliance Properties Ìý Ìý
Ìý Ìý Ìý Ìý Ìý
Vancouver Institutional University of British Columbia (UBC) New Recreation Centre 101Ìý $66
Ìý Ìý (2 structures; 2 storeys) 6138 Student Union Blvd Ìý Ìý
Ìý Ìý UBC Properties Trust Ìý Ìý
Ìý Ìý Ìý Ìý Ìý
TOTALS: Ìý Ìý 2,211 $1,214
Ìý
*A square footage measure does not apply for alteration and engineering work.
Data source and table: ÌìÃÀÓ°Ôº – CanaData.
Trend lines of construction starts in Canada – July 2022
Moving totals of the latest 12 months*
(ÌìÃÀÓ°Ôº Insight Forecast Figures)
*For example, the July 2022 figure is the sum of the monthly numbers for June 2021 through July 2022.
Data source and chart: ÌìÃÀÓ°Ôº Insight – CanaData.

Interactive Visual


View this video to see how to use the filters in the Interactive Visual.


Please click on the following links to download the PDF versions of this month’s Top 10 and Trend Lines:


Print

Recent Comments

comments for this post are closed

You might also like