The accompanying table records the 10 largest construction project starts in Canada in August 2022. Also included is the latest trend graph on starts. This looks at 12-month moving totals of the civil and non-residential building categories in Canada.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Also, total construction activity is comprised of many small and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar and square footage volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
REGION (East to West) |
TYPE OF CONSTRUCTION |
DESCRIPTION |
Sq. Ft.
000s |
Dollars
000,000s |
Quebec | Ìý | Ìý | ||
Caniapiscau | Civil/Engineering | Construction Between KM 507 and 566 of Route 389 (Section 3) (Côte- Nord). | * | $129 |
Ìý | Ìý | QC-389 | Ìý | Ìý |
Ìý | Ìý | Ministère des Transports du Québec | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Ontario | Ìý | Ìý | Ìý | Ìý |
Toronto | Residential | The Verge Condos | 450 | $86 |
Ìý | Ìý | (3 structures; 17 storeys; 545 units) 1001 the Queensway | Ìý | Ìý |
Ìý | Ìý | RioCan Real Estate Investment Trust | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Toronto | Residential | Burke Condos | 422 | $80 |
Ìý | Ìý | (3 structures; 53 storeys; 501 units) 603 Sherbourne St | Ìý | Ìý |
Ìý | Ìý | Concert Properties | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Hornepayne | Civil/Engineering | Highway 631 – Design Build Minor – Grading, Drainage, Hot Mix Paving and Structures | * | $59 |
Ìý | Ìý | ON-631 | Ìý | Ìý |
Ìý | Ìý | Ministry of Transportation Ontario | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Markham | Residential | Minu Towns | 250 | $48 |
Ìý | Ìý | (2 structures; 3 storeys; 147 units) Castlemore Ave & York Regional Rd 48 | Ìý | Ìý |
Ìý | Ìý | Stateview Homes | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Alberta | Ìý | Ìý | Ìý | Ìý |
Edmonton | Civil/Engineering | Yellowhead Trail – St. Albert Trail to 97 Street | * | $320 |
Ìý | Ìý | Multiple Locations | Ìý | Ìý |
Ìý | Ìý | City of Edmonton | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Athabasca | Civil/Engineering | Grading, Granular Base Course, Asphalt Concrete Pavement, Street Light Installation and Other Work | * | $72 |
Ìý | Ìý | Multiple Locations | Ìý | Ìý |
Ìý | Ìý | Albert Transportation | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Calgary | Civil/Engineering | 144 Avenue NW (Sage Hill Drive to 24 Street) | * | $47 |
Ìý | Ìý | 114 Avenue NW between Sage Hill Dr, 24 Street | Ìý | Ìý |
Ìý | Ìý | City of Calgary | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
British Columbia | Ìý | Ìý | Ìý | Ìý |
Coquitlam | Residential | Smith & Farrow Condominium Apartment Building – Phase 1 | 383 | $72 |
Ìý | Ìý | (2 structures; 46 storeys; 348 units) 720 Farrow St | Ìý | Ìý |
Ìý | Ìý | Boffo Development Ltd | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Surrey | Industrial | 24 Avenue Industrial Building / Surrey | 368 | $46 |
Ìý | Ìý | (2 structures; 2 storeys) 18899 24 Avenue | Ìý | Ìý |
Ìý | Ìý | CTA Architecture + Design Group (Owner’s Rep) | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
TOTALS: | Ìý | Ìý | 1,873 | $959 |
Moving totals of the latest 12 months*
(ÌìÃÀÓ°Ôº Insight Forecast Figures)
Interactive Visual
View this video to see how to use the filters in the Interactive Visual.
Please click on the following links to download the PDF versions of this month’s Top 10 and Trend Lines:
Recent Comments
comments for this post are closed