The accompanying table records the 10 largest construction project starts in Canada in July 2023. Also included is the latest trend graph on starts. This looks at 12-month moving totals of the civil and non-residential building categories in Canada.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Also, total construction activity is comprised of many small and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar and square footage volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
REGION (East to West) |
TYPE OF CONSTRUCTION |
DESCRIPTION |
Sq. Ft.
000s |
Dollars
000,000s |
Quebec | Ìý | Ìý | ||
Montreal | Institutional | Seniors Home (Former CHLSD Jeanne- Le Ber) Montreal Construction at 7401, Rue Hochelaga | 553 | $142 |
Ìý | Ìý | (1 structure; 7 storeys; 288 units) 7401, rue Hochelaga | Ìý | Ìý |
Ìý | Ìý | Société Québecoise des Infrastructures | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Roxboro | Institutional | Construction of Seniors Home Pierrefonds-Roxboro-Dollard-des-Ormeaux (Formerly CHSLD Denis-Benjamin-Viger) | 227 | $106 |
Ìý | Ìý | (2 structures; 7 storeys; 192 units) 4601, boul des Sources | Ìý | Ìý |
Ìý | Ìý | Société Québecoise des Infrastructures | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Ontario | Ìý | Ìý | Ìý | Ìý |
Niagara Falls | Institutional | Design / Build South Niagara Hospital Project | 1,300 | $3,600 |
Ìý | Ìý | (2 structures; 12 storeys; 469) Montrose Rd | Ìý | Ìý |
Ìý | Ìý | Niagara Health System | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Whitby | Institutional | Construction of Whitby Sports Complex (WSC) | 160 | $125 |
Ìý | Ìý | (2 structures; 2 storeys) Winchester Rd E & Baldwin St | Ìý | Ìý |
Ìý | Ìý | Town of Whitby | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Etobicoke | Civil/Engineering | Islington Station Redevelopment Project | 15 | $110 |
Ìý | Ìý | (5 structures; 1 storey) 1226 Islington AveE | Ìý | Ìý |
Ìý | Ìý | Toronto Transit Commission | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Hamilton | Institutional | Shalom Manor – Hamilton Campus of Care Long-Term Care Home and Assisted Living Building | 264 | $104 |
Ìý | Ìý | (2 structure; 6 storeys; 128 units) 1415 Upper Wellington St | Ìý | Ìý |
Ìý | Ìý | MMMC Architects Inc (Owner’s Rep) | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Brampton | Civil/Engineering | Widening and Reconstruction of Mississauga Road from Bovaird Drive to Mayfield Road, City of Brampton | * | $101 |
Ìý | Ìý | (2 structures) Mississauga Rd | Ìý | Ìý |
Ìý | Ìý | Region of Peel | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Alberta | Ìý | Ìý | Ìý | Ìý |
Bow Island | Civil/Engineering | Acciona – Forty Mile Wind Power Project | * | $400 |
Ìý | Ìý | (1 structure) | Ìý | Ìý |
Ìý | Ìý | Acciona Infrastructure Canada | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
British Columbia | Ìý | Ìý | Ìý | Ìý |
Dawson Creek | Institutional | RFP Contractor D/B – Dawson Creek and District Hospital Replacement Project | 263 | $590 |
Ìý | Ìý | (2 structures; 2 storeys; 70 units) 11100 13 St | Ìý | Ìý |
Ìý | Ìý | Northern HealthAuthority | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Burnaby | Civil/Engineering | John Hart Dam Seismic Upgrade – Civil Works | * | $245 |
Ìý | Ìý | (1 structure) Multiple Locations | Ìý | Ìý |
Ìý | Ìý | BC Hydro and Power Authority | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
TOTALS: | Ìý | Ìý | 2,782 | $5,532 |
Moving totals of the latest 12 months*
(ÌìÃÀÓ°Ôº Insight Forecast Figures)
Interactive Visual
View this video to see how to use the filters in the Interactive Visual.
Please click on the following links to download the PDF versions of this month’s Top 10 and Trend Lines:
Recent Comments
comments for this post are closed